Campus Elevator Addition, Nanjing Forestry University
Nanjing Forestry University required elevator access for multi-storey teaching and administrative buildings where the original structure made a conventional machine-room installation impractical.
Valin proposed a machine-room-less configuration with a compact shaft footprint, allowing installation within the existing building envelope. All steel structures were prefabricated off-site and assembled during scheduled campus holidays.
The system passed inspection and certification on first submission, and has since been in continuous operation.